Contact us +49 (0) 2972 9742 0
My Cart
Subtotal: 8.227,00 €
- Hazardous Material Storage
- Steel Spill Pallets
- Stainless Steel Spill Pallets
- Spill Pallets for IBC Storage
- Mobile Steel Spill Pallets
- Steel Spillage Decking
- Hazardous Material Depots
- Drum Transport Pallets
- Drum Stacking Racks
- Drum Storage Racks
- Hazardous material pallet racks
- Shelving Spill Trays
- Small Container Shelving
- Gas cylinder cabinets
- Drum Handling Equipment
- Operational Equipment
- Outdoor Facilities and Urban Furniture
A selection of our customers' most popular products
Every week you can find the best products here.
My Cart
Subtotal: 8.227,00 €

Big Bag Lifting Beams (1)

Crane arms for forklifts (8)

Forklift Tine Traverses (10)

Gas Cylinder Heaters (4)

Gas cylinder pallet (1)

Industrial Heating Mats (32)

Long goods storage (9)

Mesh Box Lifting Beams (3)

Pallet dollies (3)

Workshop cranes (15)
Delivery time: 1 - 3 days
Delivery time: 1 - 3 days
ATEX heating jacket for 10-liter gas cylinders, 380 W, T3-T6, Ø140 x 800 mm, without control unit
Delivery time: 7 - 8 weeks
ATEX heating jacket for 50-liter gas cylinders, 850 W, T3-T6, Ø230 x 1400 mm, without control unit
Delivery time: 7 - 8 weeks
ATEX heating jacket for 79-liter gas cylinders, 850 W, T3-T6, Ø318 x 1000 mm, without control unit
Delivery time: 7 - 8 weeks
Delivery time: 2 weeks
Delivery time: 1 - 3 days
Delivery time: 1 - 3 days
Counterweight crane with a swiveling column and telescopic boom
Delivery time: 3 - 4 weeks
Counterweight crane with hand winch, telescopic boom, load capacity of 1000 kg
Delivery time: 3 - 4 weeks
Counterweight crane with hand winch, telescopic boom, load capacity of 500 kg
Delivery time: 3 - 4 weeks
Counterweight crane, telescopic boom, load capacity of 1000 kg
Delivery time: 3 - 4 weeks
Delivery time: 3 - 4 weeks
Counterweight for counterweight cranes and workshop cranes
Delivery time: 2 weeks
Crane arm for forklift, fixed, load capacity 2000 kg, reach 2000 mm, coated
Delivery time: 2 weeks
Crane arm for forklift, fixed, load capacity 2000 kg, reach 2000 mm, galvanized
Delivery time: 2 weeks
Electrically movable workshop crane with electrohydraulic lifting and telescopic boom
Delivery time: 12 - 16 weeks
Engine hoist with telescopic boom, load capacity of 1000 kg, parallel chassis, foldable design
Delivery time: 3 - 4 weeks
Engine hoist with telescopic boom, load capacity of 1000 kg, spread chassis, foldable design
Delivery time: 3 - 4 weeks
Engine hoist with telescopic boom, load capacity of 2000 kg, parallel chassis, foldable design
Delivery time: 3 - 4 weeks
Filter Products
Material
Storage capacity
Storage levels
Surface
Recently viewed items
Delivery time: 2 weeks
Bicycle lean-to parker, single-sided, 1 parking space
Delivery time: 2 weeks
Delivery time: 2 weeks
Delivery time: 2 weeks
Steel Spill Pallet, For 1 x 600 L IBC, With Grid, Coated, 1450x950x690mm
Delivery time: 2 weeks